Working through Winter Break!

The Mechabytes meet before we left for break to briefly go over our plans to complete the model of the drive train before we came back. We started by compiling a list of the limitations we have on size as well as taking into consideration where we want over mechanisms to be placed. By the end of the meeting, we were able to come up with the basic design to be modeled during break and drew up a quick list of some parts we need to purchase. Currently, a group of us have been spending some time every other day modeling the drive train. We are on track to finish before our deadline as well!
20161213_192312